Important pages

  • Home
  • Main Navigation
  • Content
  • Contact
  • Sitemap
  • Meta Navigation
  • News
  • Selected Projects
  • List of works
  • Studio
  • Contact
  • DE
  • Lucerne Cooperative Housing KAB
  • Willisau Residential Building Grundmühle
  • Selcuk Houses
  • Ballwil Residential Buildings Gorgen
  • Schüpfheim House on Concrete Walls
  • Schwanden Triple Kindergarden
  • Lucerne House Zwyssigstrasse
  • House by the Lake
  • Wädenswil Extension House A. Studer
  • Eich Housing Development Spillmatte
  • Seon Double Kindergarden Schönbühl
  • Sulgen Vocational Training Campus
  • Biel Extension Juravorstadt
  • Ballwil Community Hall
  • Turku Museum History and Future
  • Hochdorf House Siedereistrasse
  • Lucerne Theater
  • Entlebuch Residential Buildings Schlössli
  • Adligenswil Tiny House
  • Lucerne Town Villa Roof Conversion
  • Lyss Extension Elementary School
  • Lucerne Dolmus Tiny
  • Oberkirch Terra Alta
  • Evilard Extension Elementary School
  • Buttisholz Village Center South
  • Hammetschwand Lift
  • Lucerne Lakebistro Luz
01.01.2016

Oberkirch Terra Alta

TERRA ALTA
2015-2016
Oberkirch

Competition (1st price) 
Project, realisation
Client: AG für Geburt Frau Gesundheit
Collaboration: Cerutti Partner AG
Images: Michael Schwiefert

The special feature of the building task was the desire of the builder to not let the birthplace appear as a medical building, but as a residential building. It stands on an elevation directly at the edge of the forest, from where you can enjoy the view of Lake Sempach and the mountain panorama. Two building bodies that are offset to each other link to the existing and generate a defined exterior space towards the edge of the forest. This forecourt forms the address of the birthplace.

On the ground floor, half-public use is accommodated, such as training and lounge areas and the birth section. The central, generous entrance area ensures short procedures and overview. On the upper floor, the postpartum rooms and the therapy and practice rooms are arranged.

The whole building had to be realized within six months, whereby a wooden element construction was developed on a concrete pedestal. Combined with the sustainability idea of the building owner, the wood construction was the appropriate material for this task.

The vertical facade structure as well as the dark colour treatment of the wood merge with the colour and light mood of the forest. In contrast, the interiors are lined with light spruce wood. The lighting concept by Christian Deuber gives the interiors a homelike atmosphere.