Important pages

  • Home
  • Main Navigation
  • Content
  • Contact
  • Sitemap
  • Meta Navigation
  • News
  • Selected Projects
  • List of works
  • Studio
  • Contact
  • DE
  • 2026
    • Lucerne Dolmus Tiny
    • Schüpfheim House on Concrete Walls
  • 2025
    • Lucerne House Zwyssigstrasse
    • Willisau Residential Building Grundmühle
    • Lucerne Cooperative Housing KAB
    • Schüpfheim House on a Plinth
    • Schenkon Centre
  • 2024
    • Pfaffnau School Extension
    • Berlin Rathaus der Zukunft
    • Willisau Housing in Menzbergstrasse
    • Selcuk Houses
    • Schwanden Triple Kindergarden
    • Turku Museum History and Future
    • Ballwil Residential Buildings Gorgen
  • 2023
    • Antalya Hotel Akra V
    • Sulgen Vocational Training Campus
    • Willisau Housing Bahnhofstrasse
    • Lucerne Hotel Monopol
    • Wädenswil Extension House A. Studer
    • Lucerne Housing "Am Rain"
    • House by the Lake
    • Adligenswil House Klusenmatt
    • Buttisholz Village Centre South
  • 2022
    • Adligenswil Tiny House
    • Lucerne Theatre
    • Entlebuch Residential Buildings Schlössli
    • Ballwil Community Hall
    • Biel Extension Juravorstadt
    • Willisau Residential Building Höchhusmatt
  • 2021
    • Escholzmatt Housing Development Güntenen
    • Eich Housing Development Spillmatte
    • Seon Double Kindergarden Schönbühl
    • Hochdorf House Urswilstrasse
    • Dagmersellen Centre
    • Dagmersellen School Extension
  • 2020
    • Hochdorf Residential Building Grüneggweg
    • Steckborn School Glarisegg
  • 2019
    • Hochdorf House Siedereistrasse
    • Sempach Retirement Home Stella Maris
    • Lucerne Town Villa Roof Conversion
    • Hitzkirch Police Academy
    • Aarburg Housing in Gärbiareal
    • Addis Abeba Swiss Embassy
  • 2018
    • Hochdorf Residential Building Waldner
    • Sempach House Friedau
    • Hochdorf Residential Building Seetal
    • Lyss Extension Elementary School
  • 2017
    • Schüpfheim Renovation House W. Schaad
    • Evilard Extension Elementary School
    • Faltschen Renovation Chalet
    • Rüti Double Kindergarden Winkel
  • 2016
    • Zermatt Elementary School Walka
    • Hammetschwand Lift
    • Erlinsbach two Single-Family Houses
    • Oberkirch Terra Alta
    • Brugg Historical House
  • 2014
    • Oberägeri Daycare Centre
    • Turgi Parish and Apartments
    • Van Cultural Centre
  • 2013
    • Lucerne Swimming Platform
    • Sempach Residential Buildings Zihlweid
    • Lucerne House by the River Reuss
    • Egolzwil House on the Slope
  • 2012
    • Urswil House by the Creek
    • Lucerne Barcode
  • 2010
    • Ankara Prayer and Ablution Hall
  • 2009
    • Lucerne Lakebistro Luz
01.01.2023

Buttisholz Village Centre South

VILLAGE CENTRE SOUTH
2021-2023
Buttisholz

Competition (1st round)
Project, realisation
Client: GAB Genossenschaft
Construction management: Baureag Architects
Images: OBRA visual AG

Site / Urban Design Concept

Buttisholz is recognized as a site of national importance within the Swiss Inventory of Heritage Sites (ISOS), placing the Dorfzentrum Süd project area directly within a sensitive historical context. Along Chäsistrasse, the heritage-listed Stäcklihus and Grossenhus anchor the site, their integration forming the core of the proposal.
To respect this setting, the new two-storey building is set back toward the rear, assuming the quiet presence of a discreet courtyard structure. Its scale and volume align naturally with the surrounding urban fabric while establishing a distinct architectural identity alongside the historic buildings. By keeping the new volume physically separate, the design preserves the characteristic spatial permeability and detached building typology of Buttisholz, opening up a generous public square at the center of the ensemble.

Landscape / Open Space Concept

The open spaces play a vital role within this protected village setting, and the placement of the new building clearly defines the surrounding outdoor spaces. At the centre, a generous courtyard-like square acts as the unifying element between old and new, structured by informally planted trees and brought to life by the café’s outdoor seating. This creates an inviting public space that accommodates the covered entrances to the new commercial spaces.

The bus stop is integrated into the square's design, while a planted island with seating between the new building and the Stäcklihus forms a soft spatial transition toward Hinterdorfstrasse. Along both Chäsistrasse and Hinterdorfstrasse, the public realm retains its open character. A continuous paved surface visually connects these pedestrian areas, while asphalt on the carriageway creates a clear distinction between pedestrian zones and vehicular traffic.

Access / Parking

Access to the shared underground car park is provided from both Chäsistrasse and Hinterdorfstrasse, with the overall layout establishing a clear separation between vehicular circulation and pedestrian zones. The two short-stay parking spaces near the entrance to the bakery "Brot & Co GmbH" are retained and supplemented by an accessible parking space.
Surface customer parking for the retail areas is located in the southwestern portion of the site, accessible from both Chäsistrasse and Hinterdorfstrasse. Additional short-stay spaces are arranged along the new building, while deliveries and goods handling are concentrated along the southern façade.

The bicycle Park & Ride facility is expanded and relocated between the new building and the existing "Grossenhus", forming a spatial transition between the courtyard and the access road. Tenant and staff parking, along with storage, drying, and technical facilities, are positioned in the basement. The basement layout also accommodates a potential future connection to plot 384 without requiring structural modifications.

Programme

All uses, including commercial areas and apartments, are organised on a modular grid, allowing for high flexibility in layout, furnishing, and interior fit-out. The ground floor accommodates approximately 850 m² of retail space, with around 650 m² situated within the new building. Designed with long-span trusses, the primary commercial floor plan remains column-free to maximise layout adaptability. This configuration supports an efficient ground-floor operation and an engaging retail experience. The upper floor of the new building contains six spacious apartments: three 2.5-room and three 3.5-room units. Accessed efficiently via a shared access gallery, the open-plan layouts offer varied unit sizes to respond to diverse resident needs.

All apartments meet contemporary residential standards, featuring step-free accessibility throughout, generous bathrooms, and flexible furnishing options. Each unit includes a dedicated utility room equipped with a washing machine and dryer, while generous loggias offer a high degree of privacy.

The basement accommodates 17 parking spaces, tenant storage, drying and technical rooms, and ancillary space for commercial operations. The uses within the existing Stäcklihus and Grossenhus remain unchanged.

Construction / Material Concept

The new building is designed as a prefabricated timber structure featuring a ventilated wooden façade. Timber was selected as a sustainable, locally sourced, and traditional material. The exterior cladding is constructed from spruce timber and treated with a natural rye flour. The additive façade structure creates a coherent appearance and a distinctive architectural expression. By exposing raw materials and using them efficiently, the building’s straightforward character is reinforced. The finely articulated elevation lends the structure a tactile quality while blending with the surrounding village context.

The roof is extensively greened to support natural rainwater retention. Exterior fabric blinds provide effective solar shading, ensuring a comfortable indoor climate year-round. An efficient pellet heating system generates environmentally friendly energy, complemented by a mechanical ventilation system that ensures high indoor comfort.

With its compact volume, the building meets the Minergie standard. The simple two-storey layout allows for a highly cost-effective implementation of fire safety requirements while complying with all standard escape route lengths and necessary building separation distances.